Реферат: | eng: The description of the DWD-contribution (DWD - Deutscher Wetterdienst) in the work under the EU-Project 'An European Flood Forecasting System' (EU-Contract EVG1-CT-1999-00011 EFFS) is presented. The aim of the EU-funded project was the development of a prototype version of a medium-range (up to 10 days ahead) flood forecasting system for the whole of Europe. The brief description of methods for preparing input meteorological fields on high performance systems for EU-Project and the complex operational models of an atmosphere used for their construction are given. The used algorithm for numerical analysis of high-resolution analyses of 24h precipitation heights on the basis of surface observations for the four flood events in 1994 (Po, November), 1995 (Rhine/Meuse, January), 1997 (Odra, July) and 2002 (Elbe, August) is presented. © 2006 Springer-Verlag Berlin Heidelberg.
|